Quantcast

Before & After Photos

Click on a photo to enlarge.

Foundation Walls Bowing Repaired in Englishtown, NJ Home

A homeowner in Englishtown, New Jersey had bowing foundation walls and contacted Quality 1st for a solution. Our System Design Specialist inspected the foundation and recommended that CarbonArmor Wall Reinforcing System was installed.

CarbonArmor are strips made from a reinforced polymer that is 10 times stronger than steel. The straps are attached to the wall and secured with heavy duty steel brackets. The straps will stabilize the wall and begin to pull it back to its original position.   

Clean Space Installation in Manalapan, NJ

CleanSpace Vapor Barrier System is the perfect solution to any cold, damp or nasty crawl space! CleanSpace is a liner that is installed on the walls of the crawl space to seal it off from the outside environment. Water, moisture and mold are no match for this Vapor Barrier liner. 

 

Concrete Patio Slabs Rasied In Manalapan, NJ

Quality 1st Basement Systems was able to lift and level the patio of this homeowner in Manalapan, NJ. The concrete slabs had been sinking for a while and they were posing a tripping hazard to the guest who would walk during outdoor activities. Foreman, Sean Johnson and his team, went out to the site to lift the concrete slabs and eliminate the tripping hazard.

Pool Deck Repair in Manalapan, NJ

A homeowner in Manalapan, NJ noticed the concrete patio slabs on their pool deck sank, causing a tripping hazard near the edge. The homeowner wanted to get this resolved before the pool closed up for the winter, so they contacted Quality 1st Basement Systems to find a solution. Our System Design Specialist, Jack Huber, fully inspected the pool deck and knew our crew would be able to repair it using the Polylevel Injection. After the repair, the patio slabs were risen back to its original height, allowing the homeowner to reopen their pool next summer without any worries. 

Pool Deck Repair in Manalapan, NJ

This Manalapan, NJ homeowner was planning on closing their pool for the winter. Before they could close it up, they needed to have it repaired after finding the edge had sunken one to two inches. We had our System Design Specialist, Andrew G., inspect and provide an estimate for the homeowner. After fully inspecting the problem, Andrew knew our crew would be able to easily lift the sunken edge using the Polylevel Injection. After the installation was done by our crew, the pool edge was leveled and ready to be closed up for the winter. 

Our Products
Finishing Ideas
About
Learning Center
Become a Dealer
Free Estimate